Monthly Rate

The rate for electric service and the rate used to calculate any monthly billing credits not to exceed the Member’s electric requirements on a monthly basis, shall be the Cooperative’s Single Phase Service Rate or Three Phase General Service Rate, as applicable, except for the monthly Distribution Service Minimum Charge. The rate used to calculate any monthly billing credits for electric energy production of the Member’s electric generating facility above the Member’s electric energy usage in any month shall be Buckeye’s avoided cost rate.

Single Phase Distribution Service Minimum Charge: $47.50

Net Metering Rate will change yearly. The current rate is $.076 (updated 2/2023)