To provide for the safety of consumers, Cooperative personnel, and the public in general, and to assure reliable electric service consistent with the Cooperative’s Operational Policy relating to DR facilities, the following rules and regulations are established for the interconnection and operation of consumer-owned or operated DR facilities. Capitalized terms used but not defined herein shall have the meanings assigned to them in the Cooperative’s Operational Policy for DR facilities.
The following rules and regulations apply to all Qualifying Facilities having a capacity of not more than 10 MVA, and to all DR facilities that are not Qualifying Facilities but that are approved by Buckeye and the Cooperative. Qualifying Facilities of more than 10 MVA of capacity will be treated on an individual case by case basis. These rules and regulations amend and restate the Rules and Regulations for Qualifying Cogeneration and Small Power Production Facilities, Policy – 602, previously adopted by the Cooperative. These rules and regulations apply to both existing and proposed installations, and are subject to change from time to time as may be deemed necessary or desirable by the Cooperative or as may be required by governmental authorities.
It shall be the responsibility of the President of the Cooperative to administer the provisions of this policy. The Cooperative shall reconsider, and if necessary update, this policy every 5 years or more frequently as circumstances warrant.
Approved by the Board of Trustees: Jeffrey S. Wilson, Chairman